Nidhi Park, Brahman Society, Near Airport, Porbandar, India

About 1 mile opposite Porbandar Airport

Plastering Work Almost Complete

Saturday, December 12th, 2009

I’ve been looking over the plastering work on the Nidhi Park homes and getting soem of the plastering to a level that I am happy with.

Most of the interiors have been completed and the front of the homes remain to be done.

Tiling the floors and some of the kitchens and�bathrooms/toilets will be the next stage.

Read the whole Post »

5 More Feet of Land Acquired

Thursday, November 5th, 2009

We have extended the rear of the 2 homes by about 5 feet to create rear garden space which was previously unused government land.

Read the whole Post »

First Floor Walls of The 2 Homes Have Been Completed

Thursday, September 24th, 2009

The first floor walls of the homes being built in India are now completed (apart from the balcony walls). The door and window frames (have been put in place, with their lentils created with solid concerete and steel, ready for the actual doors and windows, and the stairs have been built in solid concrete.

Read the whole Post »

More Views of The Ground Floor

Thursday, September 24th, 2009

I received a few more photos of the ground floors of the two homes I am building for sale in India.

Read the whole Post »

2 Semi-Detached Homes For Sale

Saturday, September 12th, 2009

As some of you know I have been developing a couple of homes for sale in India.

The location is Nidhi Park, Brahman Society, Chhanya area, Porbandar in Gujarat and opposite Porbandar airport.

I’ve put up a simple development picture and a video to give you and idea of what the homes will look like.

Also, there are thumbnails which you can click on to get A4 PDFs of the plans.

Read the whole Post »

First Floor Building Work in Progress

Thursday, September 10th, 2009

The ground floor ceiling has been completed in sold concrete and which has been watered over a period of about a week to avoid cracks in the hot weather.

The first floor work was started about a week or so ago and I have been told that the building work on this forst floor has got to about 6 1/2 feet as the lentils are being created above all the door and window frames.

Read the whole Post »

Ground Floor Building Complete – Now The Ceiling

Monday, August 10th, 2009

The ground floor of the homes that I’m building has been completed to a level where the ceiling and stairs to the first floor can be started work on.

The ceilings and stairs are made from solid concrete by binding sheets of metal and wood together to create the required moulds. This takes most of the time and then it’s a matter of filling the moulds with concrete and due to the heat, constantly watering the cement over about a week to ensure that it does not crack.

Read the whole Post »